1. Bell Bottom Creek: Bell Bottom Creek Channel Rehabilitation – Phase 1 $2,167,000 This project will clear, desilt, and regrade approximately 9200 linear feet of Bell Bottom Creek. 2. Bessies …
This item is available in full to subscribers.
To continue reading, you will need to either log in to your subscriber account, below, or purchase a new subscription.
Please log in to continue |
1. Bell Bottom Creek: Bell Bottom Creek Channel Rehabilitation – Phase 1 $2,167,000
This project will clear, desilt, and regrade approximately 9200 linear feet of Bell Bottom Creek.
2. Bessies Creek: Gassner Road Regional Detention Basin – Phase 1 $15,007,000
This project will construct a regional stormwater detention basin, capable of holding approximately 106 acre-feet of excess stormwater during heavy rain events and reducing flood hazards in surrounding neighborhoods within the City of Brookshire.
3. Brookshire Creek: Stalknecht Road Regional Detention Basin – Phase 1 $17,080,000
This project will construct a regional stormwater detention basin, capable of holding approximately 68 acre-feet of excess stormwater during heavy rain events and reducing flood hazards along Brookshire Creek.
4. Stella Road Regional Detention Basin and Channel Improvements – Phase 1 $23,913,000
This project will clear, desilt, and regrade approximately 4,550 linear feet of tributary channel. It will also construct a regional stormwater detention basin, capable of holding approximately 132 acre-feet of excess stormwater during heavy rain events and reducing flood hazards along Brookshire Creek.
5. Cane Island Branch of Buffalo Bayou” Cane Island Branch Channel Rehabilitation $6,032,000
This project will clear, desilt, and restore approximately 4000 linear feet of Cane Island Branch. Rock buttress will be installed to enhance slope stability and mi